Nach oben springen

It is costs effective to install the HT Film on industrial storage tanks. No need for expensive scaffolding with protective netting. Sky climbers and cherry pickers will do it. On raw steel surface a top primer is necessary before installation. On existing paint coating a proper preparation is needed.

  • Washing down with max. 800 bar
  • Degreasing
  • De-rusting (scraping if necessary)
  • Priming
  • Painting of mountings, fittings, valves, base, handrails, nozzles etc.
  • Application of anti-corrosion HT Film